Irrigation and Energy Work Division
Irrigation and Energy Work Division is one among the three-pillar business units of ECO. Taking the necessity to maximize productivity by utilization of available natural resources through implementation of irrigation practice and energy sector development, the corporation has envisaged formulation of a self-sustained division capable of working study, design and construction supervision including contract administration tasks. The two directorates (Dam and Energy & Irrigation and Drainage) undertake, study, design and construction Contract Administration and supervision (CAS) services by their respective teams and workers to the satisfaction of customers using state of art work methodologies, standards and software.

The division aspires a successful service delivery with excellence in Irrigation and drainage systems study, design and supervision work of hydraulic structures like Dams, weirs, intakes, associated infrastructure besides to commencing service on large- and small-scale hydropower and other energy sources’ development projects.
Irrigation and Drainage projects’ study and design activity involves multi-disciplinary and succeeding stages of information gathering, stakeholder consultation, conceptualization and decision-making, which systematically bears one full-fledged study and design document comprising under shown major fields of specializations.

As an indication to the endeavors made by the corporation in Irrigation and Drainage sector, few indicative projects have been listed hereunder.
List of Some of completed Study and Design Projects
Project Name |
Client |
Contract amount |
Arjo Dhidhesa Sugarcane Development irrigation Project feasibility study & design | MoWIE | 44,692,292.00 |
Oromia Irrigation Potential Assessment | OIDA | 86,892,536.63 |
Central Oromia Irrigation Based Integrated Development Project | OIDA | 1,086,940.00 |
Wabe-Shebele and Gennale-Dawa basin small- and large-scale pump irrigation | MoA | 3,247,306.00 |
Wolkayit Sugar Development Project Main Canal Design | TRWSDE | 1,075,883,55 |
Wabe-Shebele and Gennale-Dawwa basin small- and large-scale pump irrigation) | MoA | 3,247,306.00 |
Lower-Dhidhessa Irrigation & Drainage, Feasibility & Detail Eng. Design | MoWIE | 76,498,855.14 |
List of Some of Contract Administration and supervision Projects
Project Name |
Client |
Contract amount |
Status |
Arjo Dhidhesa Dam |
MoWIE |
25,725,865.63 |
On going |
Arjo-Dhidheessa Right Main canal & associated structures (L_I&L_2) |
ECWC |
34,726,567.25 |
On going |
Fentale and Tibila Irrigation project |
OIDA |
14,452,827.12 |
|
Yadot Large Scale Irrigation Project |
OANRB |
9,109,357.00 |
On going |
Mojo Medium Scale Irrigation Project |
OANRB |
9,930,010.0 |
On going |
Chelchel Large scale Irrigation Project |
MoWIE |
64,867,483.3 |
On going |